Teledyne Tekmar Aquatek LVA – Site Preparation Checklist
Manuals | 2019 | Agilent TechnologiesInstrumentation
Ensuring that laboratory space, utilities and environmental conditions meet equipment specifications is a fundamental step to guarantee reliable performance and longevity of analytical instruments such as the Teledyne Tekmar Aquatek LVA.
This document defines the customer responsibilities and site requirements prior to installation of the Aquatek LVA Purge & Trap Sampler. It outlines space allocation, environmental controls, electrical needs, and consumable supplies to facilitate a smooth, on-time system deployment.
Customer tasks are organized into four main areas:
The primary instrument is the Aquatek LVA P&T Sampler, requiring no additional analytical modules beyond standard bench utilities.
Dimension and weight specifications ensure bench compatibility and safe placement. Environmental stability is critical for reproducible sample trapping and desorption. Accurate line voltage and power capacity prevent interruptions during automated purging cycles. Providing the correct column lengths and chiller connections reduces method development time and avoids analytical challenges.
Laboratory informatics integration may automate site-readiness checks via IoT sensors for temperature, humidity and power monitoring. Virtual installation guidance and augmented-reality overlays could further streamline customer preparations. Predictive analytics might flag potential site issues before delivery, improving first-time installation success.
A thorough pre-installation checklist empowers laboratories to meet the technical requirements of the Aquatek LVA Sampler. By addressing space, environment, power and consumables in advance, organizations can achieve timely installations, consistent performance and reduced service interruptions.
Purge and Trap
IndustriesManufacturerAgilent Technologies, Teledyne LABS
Summary
Importance of Proper Site Preparation
Ensuring that laboratory space, utilities and environmental conditions meet equipment specifications is a fundamental step to guarantee reliable performance and longevity of analytical instruments such as the Teledyne Tekmar Aquatek LVA.
Objectives and Overview
This document defines the customer responsibilities and site requirements prior to installation of the Aquatek LVA Purge & Trap Sampler. It outlines space allocation, environmental controls, electrical needs, and consumable supplies to facilitate a smooth, on-time system deployment.
Methodology and Instrumentation
Customer tasks are organized into four main areas:
- Laboratory bench space: allocate a stable, obstruction-free area capable of supporting 31.75 kg and measuring approximately 64.2 cm high × 54.8 cm deep × 66.8 cm wide.
- Environmental conditions: maintain ambient temperature between 10–30 °C and relative humidity of 10–90 % with minimal drafts or temperature fluctuations; avoid direct sunlight or nearby HVAC outlets.
- Electrical supply: provide 100–240 VAC, 50/60 Hz power with at least 300 W capacity and the correct outlet types, allowing extra capacity if a computer system is included.
- Operating supplies: prepare laboratory-grade gases, plumbing connections, and recommended consumables (e.g., 20 m or 30 m VOC columns for EPA methods, chiller bath with 1/4" ID tubing if required).
The primary instrument is the Aquatek LVA P&T Sampler, requiring no additional analytical modules beyond standard bench utilities.
Main Requirements and Discussion
Dimension and weight specifications ensure bench compatibility and safe placement. Environmental stability is critical for reproducible sample trapping and desorption. Accurate line voltage and power capacity prevent interruptions during automated purging cycles. Providing the correct column lengths and chiller connections reduces method development time and avoids analytical challenges.
Benefits and Practical Applications
- Minimizes installation delays by clarifying site readiness in advance.
- Reduces risk of equipment downtime due to inadequate power or space constraints.
- Supports adherence to EPA 5030/5035 and 8260/524.x methods by prescribing suitable consumables.
- Enhances operator safety and maintenance efficiency through early identification of waste-line and bench placement considerations.
Future Trends and Opportunities
Laboratory informatics integration may automate site-readiness checks via IoT sensors for temperature, humidity and power monitoring. Virtual installation guidance and augmented-reality overlays could further streamline customer preparations. Predictive analytics might flag potential site issues before delivery, improving first-time installation success.
Conclusion
A thorough pre-installation checklist empowers laboratories to meet the technical requirements of the Aquatek LVA Sampler. By addressing space, environment, power and consumables in advance, organizations can achieve timely installations, consistent performance and reduced service interruptions.
References
- Agilent Technologies. Teledyne Tekmar Aquatek LVA Site Preparation Checklist, Document G8161A, Revision 01, February 2019.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Teledyne Tekmar Atomx XYZ – Site Preparation Checklist
2017|Teledyne LABS|Manuals
G8160A Teledyne Tekmar Atomx XYZ – Site Preparation Checklist Thank you for purchasing a Tekmar Atomx XYZ. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site…
Key words
checklist, checklistspecial, specialsite, sitexyz, xyzcustomer, customeroperating, operatingnotes, notestechnologies, technologiesdescription, descriptionconsumption, consumptioninstrument, instrumentpreparation, preparationagilent, agilentweight, weightpower
4300 Handheld FTIR Spectrometer– Hardware Site Preparation Checklist
2013|Agilent Technologies|Manuals
4300 Handheld FTIR Spectrometer– Hardware Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistaccessory, accessorysite, sitespecial, specialhardware, hardwarerevision, revisiontechnologies, technologiescustomer, customeroperating, operatingnotes, notesapprover, approvercondensing, condensinginstrument, instrumentagilent, agilentpreparation
4300 Handheld FTIR Spectrometer– Hardware Site Preparation Checklist
2011|Agilent Technologies|Manuals
4300 Handheld FTIR Spectrometer– Hardware Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
checklist, checklistaccessory, accessorysite, sitespecial, specialhardware, hardwarerevision, revisiontechnologies, technologiescustomer, customeroperating, operatingnotes, notesapprover, approvercondensing, condensinginstrument, instrumentagilent, agilentpreparation
Teledyne Tekmar Aquatek100 Purge and Trap - Site Preparation Checklist
2011|Teledyne LABS|Manuals
Teledyne Tekmar Aquatek100 Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitecustomer, customeroperating, operatingspecial, specialtechnologies, technologiesdescription, descriptionnotes, notesconsumption, consumptioninstrument, instrumentpreparation, preparationagilent, agilentweight, weightpower, powersupplies