GCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Teledyne Tekmar Aquatek100 Purge and Trap - Site Preparation Checklist

Manuals | 2011 | Agilent TechnologiesInstrumentation
Purge and Trap
Industries
Manufacturer
Teledyne LABS

Summary

Significance of the Topic


Proper site preparation is essential for the reliable installation and long-term performance of purge and trap systems used in trace organic analysis. Ensuring appropriate bench space, utilities and environmental conditions minimizes downtime, extends instrument life and supports compliance with regulatory and quality standards.

Objectives and Overview


This document provides a structured checklist for customers to verify laboratory readiness prior to delivery and installation of the Teledyne Tekmar Aquatek100 Purge and Trap system. It outlines spatial, environmental, electrical and consumable requirements, helping to streamline installation and reduce delays.

Used Instrumentation


  • Teledyne Tekmar Aquatek100 Purge and Trap system
  • Aquatek100 Autosampler module
  • Stratum Purge and Trap Concentrator

Methodology


The site preparation approach is organized into discrete categories: bench space assessment, environmental control, power requirements and operating supplies. Each section lists customer responsibilities and special notes to guide pre-installation verification.

Main Findings and Discussion


  • Bench Space: The autosampler module requires a stable support for a 72.4 cm height, 48.3 cm depth and 45.7 cm width footprint, with a weight of 17.7 kg.
  • Environmental Conditions: Optimal performance is achieved at 10–30 °C and 10–90% relative humidity. Avoid direct heat, cold drafts and vibration sources.
  • Power Consumption: The concentrator operates at 115 V or 240 V, drawing up to 300 VA. Additional outlets may be needed for connected PCs.
  • Operating Supplies: Recommended consumables include appropriate tubing, VOC columns of 20 m or 30 m length for EPA methods, and cooling bath equipment for the chiller option.

Benefits and Practical Applications


Following this checklist reduces installation errors, safeguards instrument integrity and accelerates method deployment in environmental, drinking water and industrial laboratories. Proper site readiness enables uninterrupted data acquisition for regulatory compliance and process monitoring.

Future Trends and Opportunities


Advances may include integrated self-diagnostic sensors for real-time environment monitoring, predictive site-readiness tools driven by digital twins and remote qualification services to support global deployment.

Conclusion


A systematic site preparation process is critical for efficient installation and consistent performance of purge and trap systems. Adhering to the outlined requirements ensures operational readiness and supports high-quality analytical workflows.

References


No specific references provided.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Teledyne Tekmar ATOMX Purge and Trap - Site Preparation Checklist
Teledyne Tekmar ATOMX Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
atomx, atomxpurge, purgemultimatrix, multimatrixteledyne, teledynetekmar, tekmartrap, trapchecklist, checklistsite, sitecustomer, customeroperating, operatingspecial, specialconcentrator, concentratortechnologies, technologiesdescription, descriptionnotes
Teledyne Tekmar Stratum Purge and Trap - Site Preparation Checklist
Teledyne Tekmar Stratum Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
stratum, stratumpurge, purgetrap, trapteledyne, teledynetekmar, tekmarconcentrator, concentratorchecklist, checklistsite, sitecryo, cryocustomer, customeroperating, operatingspecial, specialfocusing, focusingtechnologies, technologiesinstrument
Agilent Teledyne Tekmar Aquatek100 Autosampler Site Preparation Checklist
Agilent CrossLab Start Up Services Agilent Teledyne Tekmar Aquatek100 Autosampler Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full…
Key words
special, specialservice, servicecustomer, customersite, sitenotes, notesengineer, engineeroperating, operatingweight, weightrequirements, requirementsreview, reviewpreparation, preparationpower, powerconsumption, consumptionspecific, specificinstrument
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, traptekmar, tekmarteledyne, teledynechecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Other projects
LCMS
ICPMS
Follow us
FacebookX (Twitter)LinkedInYouTube
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike