GCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

G348xA and G349xA Chemiluminescence Detector Site Preparation Checklist

Brochures and specifications | 2016 | Agilent TechnologiesInstrumentation
GC
Industries
Manufacturer
Agilent Technologies

Summary

Importance of the Topic


Chemiluminescence detection of nitrogen and sulfur compounds is widely used in environmental, petrochemical, and pharmaceutical analysis due to its high sensitivity and specificity. Proper site preparation directly influences instrument performance and longevity by ensuring stable environmental and utility conditions.

Objectives and Overview


This guide outlines the laboratory requirements for installing Agilent G348xA (sulfur) and G349xA (nitrogen) chemiluminescence detectors. It aims to help users verify bench space, ambient conditions, power supply, and operating consumables prior to instrument delivery.

Methodology


  • Spatial Requirements: Detailed bench dimensions including height clearance (≥18 cm above GC) and rear clearance (≥25 cm) for vacuum connections.
  • Environmental Conditions: Stable ambient temperature (10–40 °C), 5–80% relative humidity, avoidance of direct drafts or sunlight.
  • Power Supply: Single-phase 120 VAC or 240 VAC, 1200 VA capacity with dedicated outlets for detectors and peripherals.
  • Operating Supplies: High-purity gases (H₂, O₂, zero-grade air) with appropriate regulators (CGA standards) and supply pressures ≥138 kPa above operating pressure.
  • Exhaust Venting: Recommendations for fume hood or dedicated vent system for waste gases from the vacuum pump.

Used Instrumentation


  • Agilent G348xA Chemiluminescence Detector (Sulfur Mode)
  • Agilent G349xA Chemiluminescence Detector (Nitrogen Mode)
  • Edwards RV5 Vacuum Pump
  • Gas Regulators: CGA 346, CGA 350, CGA 540 compatibility

Main Findings and Discussion


The checklist emphasizes the importance of precise bench allocation and environmental control to avoid operational issues. Adequate gas purity and pressure are essential to maintain signal stability. Proper venting ensures compliance with safety and environmental regulations, while clear power specifications prevent installation delays.

Benefits and Practical Applications


  • Reduces risk of installation setbacks by preemptively verifying site readiness.
  • Enhances detector reliability and analytical accuracy in trace-level nitrogen and sulfur measurements.
  • Supports regulatory compliance through controlled waste handling and environmental parameters.

Future Trends and Possibilities


Advances may include remote monitoring of environmental conditions, automated self-calibration routines, integration with cloud-based laboratory management systems, and use of greener carrier gases to reduce laboratory footprint.

Conclusion


A thorough site preparation aligned with the Agilent checklist ensures optimal performance and longevity of G348xA and G349xA chemiluminescence detectors. Addressing spatial, environmental, power, and supply requirements ahead of time streamlines installation and supports consistent analytical results.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Teledyne Tekmar Atomx XYZ – Site Preparation Checklist
G8160A Teledyne Tekmar Atomx XYZ – Site Preparation Checklist Thank you for purchasing a Tekmar Atomx XYZ. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site…
Key words
checklist, checklistspecial, specialsite, sitexyz, xyzcustomer, customeroperating, operatingnotes, notestechnologies, technologiesdescription, descriptionconsumption, consumptioninstrument, instrumentpreparation, preparationagilent, agilentweight, weightpower
Teledyne Tekmar Aquatek LVA – Site Preparation Checklist
  G8161A - Teledyne Tekmar Aquatek LVA – Site Preparation Checklist Thank you for purchasing a Tekmar Aquatek LVA. To get you started and to assure a successful and timely installation, please refer to this specification or set of…
Key words
checklist, checklistsite, sitecustomer, customerrevision, revisiontechnologies, technologieslva, lvaaquatek, aquatekspecial, specialagilent, agilentpreparation, preparationparagraph, paragraphoperating, operatingresponsibilities, responsibilitiesnotes, notessection
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, traptekmar, tekmarteledyne, teledynechecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, trapteledyne, teledynetekmar, tekmarchecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Other projects
LCMS
ICPMS
Follow us
FacebookX (Twitter)LinkedInYouTube
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike