Teledyne Tekmar ATOMX Purge and Trap - Site Preparation Checklist
Manuals | 2011 | Agilent TechnologiesInstrumentation
Purge and Trap
IndustriesManufacturerTeledyne LABS
Summary
Importance of the Topic
Proper site preparation ensures reliable installation and long-term performance of the ATOMX Purge and Trap system. Adhering to these guidelines minimizes downtime and safeguards analytical data quality.Objectives and Overview of the Document
This checklist outlines spatial, environmental, electrical and consumable requirements for the Teledyne Tekmar ATOMX Purge and Trap system. It aims to guide laboratory staff through pre-installation tasks to ensure a smooth and timely setup process.Methodology and Instrumentation
- Instrument: ATOMX Multimatrix Autosampler with Purge and Trap Concentrator
- Physical specifications: weight ~43.1 kg, width 83.1 cm, depth 59.2 cm, height 67.3 cm
- Environmental requirements: operating temperature 10–30 °C, relative humidity 10–90 %, pH-resistant front cover
- Power: factory-configured for 100, 120 or 240 V at 50/60 Hz; maximum consumption 1200 VA
- Required supplies: VOC columns (20 or 30 m recommended), optional chiller with 1/4" tubing, general consumables listed by vendor
Main Findings and Discussion
The document emphasizes bench space free of obstructions and overhangs to support the instrument’s weight. Stable ambient conditions and airflow management prevent temperature fluctuations and vibrations. Electrical outlets must match factory settings and account for any computer system. A detailed list of consumables and optional services facilitates planning and reduces the risk of installation delays.Benefits and Practical Applications
- Ensures timely installation and commissioning
- Reduces risk of equipment damage and performance issues
- Supports compliance with quality assurance and regulatory requirements
- Provides a structured approach to resource and space allocation
Future Trends and Applications
Anticipated developments include remote diagnostics and automated site readiness verification. Integration with laboratory information management systems (LIMS) and IoT-enabled environmental monitoring can further streamline installation and maintenance workflows. Advances in consumable design may also reduce preparation complexity.Conclusion
Comprehensive site preparation is critical for the successful deployment of the ATOMX Purge and Trap system. Following these specifications ensures reliable operation, data integrity and efficient laboratory integration.References
- Teledyne Tekmar ATOMX Purge and Trap Site Preparation Checklist, Agilent Technologies, Issued 06-12-2011, Revision 01
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Teledyne Tekmar Stratum Purge and Trap - Site Preparation Checklist
2011|Teledyne LABS|Manuals
Teledyne Tekmar Stratum Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
stratum, stratumpurge, purgetrap, trapteledyne, teledynetekmar, tekmarconcentrator, concentratorchecklist, checklistsite, sitecryo, cryocustomer, customeroperating, operatingspecial, specialfocusing, focusingtechnologies, technologiesinstrument
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
2016|Teledyne LABS|Manuals
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, traptekmar, tekmarteledyne, teledynechecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
2011|Teledyne LABS|Manuals
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, trapteledyne, teledynetekmar, tekmarchecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
2016|Teledyne LABS|Manuals
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, trapteledyne, teledynetekmar, tekmarchecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation