Teledyne Tekmar Stratum Purge and Trap - Site Preparation Checklist
Manuals | 2011 | Agilent TechnologiesInstrumentation
Proper site preparation for purge and trap systems is essential to ensure reliable, safe, and reproducible performance in environmental and industrial laboratories. An optimized installation environment minimizes downtime, protects instrument lifespan, and supports regulatory compliance.
This document provides a structured checklist to guide laboratory managers and technicians through all necessary preparations prior to installing the Teledyne Tekmar Stratum Purge and Trap system. Key aims include:
The checklist format divides requirements into clear sections. Space and weight specifications are drawn from the instrument datasheet. Environmental conditions such as temperature, humidity, and heat dissipation are tabulated and translated into operational guidelines. Power consumption details inform electrical outlet placement. Consumable recommendations and interface cable instructions are summarized.
Used instrumentation:
Bench space must accommodate the main module (50.2 cm H × 20.3 cm D × 47 cm W; 14.5 kg) and the Cryo Focusing Module (21.6 cm H × 8.9 cm D × 10.2 cm W; 1.1 kg). Ambient laboratory temperature should remain between 10 °C and 30 °C with 10–90 % humidity. Power requirements of 115 V or 230 V input and up to 600 VA (main unit) and 1150 W (cryo module) must be supplied. Recommended consumables and interface cables are specified to avoid installation delays and method development challenges.
Advances may include integrated digital monitoring of site conditions, automated consumable tracking, predictive maintenance algorithms, and tighter coupling with laboratory information management systems (LIMS) to streamline quality assurance workflows.
Adhering to a site preparation checklist for the Stratum Purge and Trap system is a critical step in achieving high-quality analytical results. Early verification of space, utilities, and consumables reduces risk, ensures seamless commissioning, and supports long-term operational excellence.
Purge and Trap
IndustriesManufacturerTeledyne LABS
Summary
Significance of Topic
Proper site preparation for purge and trap systems is essential to ensure reliable, safe, and reproducible performance in environmental and industrial laboratories. An optimized installation environment minimizes downtime, protects instrument lifespan, and supports regulatory compliance.
Objectives and Study Overview
This document provides a structured checklist to guide laboratory managers and technicians through all necessary preparations prior to installing the Teledyne Tekmar Stratum Purge and Trap system. Key aims include:
- Verifying laboratory space and bench strength
- Confirming environmental controls and gas/plumbing supplies
- Ensuring correct power infrastructure
- Listing required operating consumables and accessories
Methodology and Instrumentation
The checklist format divides requirements into clear sections. Space and weight specifications are drawn from the instrument datasheet. Environmental conditions such as temperature, humidity, and heat dissipation are tabulated and translated into operational guidelines. Power consumption details inform electrical outlet placement. Consumable recommendations and interface cable instructions are summarized.
Used instrumentation:
- Teledyne Tekmar Stratum Purge and Trap Concentrator
- Cryo Focusing Module
Main Results and Discussion
Bench space must accommodate the main module (50.2 cm H × 20.3 cm D × 47 cm W; 14.5 kg) and the Cryo Focusing Module (21.6 cm H × 8.9 cm D × 10.2 cm W; 1.1 kg). Ambient laboratory temperature should remain between 10 °C and 30 °C with 10–90 % humidity. Power requirements of 115 V or 230 V input and up to 600 VA (main unit) and 1150 W (cryo module) must be supplied. Recommended consumables and interface cables are specified to avoid installation delays and method development challenges.
Benefits and Practical Applications
- Guaranteed instrument stability and performance over time
- Prevention of installation setbacks and additional service costs
- Improved safety and compliance with environmental testing standards
Future Trends and Opportunities
Advances may include integrated digital monitoring of site conditions, automated consumable tracking, predictive maintenance algorithms, and tighter coupling with laboratory information management systems (LIMS) to streamline quality assurance workflows.
Conclusion
Adhering to a site preparation checklist for the Stratum Purge and Trap system is a critical step in achieving high-quality analytical results. Early verification of space, utilities, and consumables reduces risk, ensures seamless commissioning, and supports long-term operational excellence.
References
- Teledyne Tekmar Stratum Purge and Trap Site Preparation Checklist, Agilent Technologies, Issued 06-12-2011, Revision 01
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
2016|Teledyne LABS|Manuals
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, traptekmar, tekmarteledyne, teledynechecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
2011|Teledyne LABS|Manuals
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, trapteledyne, teledynetekmar, tekmarchecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Teledyne Tekmar Lumin Purge and Trap - Site Preparation Checklist
2016|Teledyne LABS|Manuals
Teledyne Tekmar Lumin Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
lumin, luminpurge, purgetrap, trapteledyne, teledynetekmar, tekmarchecklist, checklistsite, siteconcentrator, concentratortechnologies, technologiescustomer, customeroperating, operatingspecial, specialagilent, agilentinstrument, instrumentpreparation
Teledyne Tekmar Aquatek100 Purge and Trap - Site Preparation Checklist
2011|Teledyne LABS|Manuals
Teledyne Tekmar Aquatek100 Purge and Trap Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation…
Key words
checklist, checklistsite, sitecustomer, customeroperating, operatingspecial, specialtechnologies, technologiesdescription, descriptionnotes, notesconsumption, consumptioninstrument, instrumentpreparation, preparationagilent, agilentweight, weightpower, powersupplies