GCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Agilent OpenLab ECM XT Server/ OpenLab Server v2.5 - Site Preparation Checklist

Manuals | 2020 | Agilent TechnologiesInstrumentation
Software
Industries
Manufacturer
Agilent Technologies

Summary

Importance of the Topic


Correct site preparation ensures reliable installation and long-term operation of Agilent OpenLab ECM XT and OpenLab Server. A comprehensive checklist mitigates unforeseen delays, aligns laboratory and IT teams, and supports consistent performance of informatics systems.

Objectives and Overview


This document outlines the key requirements and customer responsibilities for deploying Agilent OpenLab ECM XT Server and OpenLab Server v2.5. It aims to guide users through environmental, hardware, software, and networking specifications to achieve a smooth and timely installation.

Applied Methodology and Instrumentation


The approach involves a systematic review of site conditions against predefined specifications. Core elements include:
  • Computing environment setup, space allocation, and backup solution planning
  • Software prerequisites: supported operating systems, database platforms, web browsers, and .NET frameworks
  • Hardware configuration: processor selection, memory sizing, storage architecture, and network interfaces
  • Network design: TCP/IP communication, subnet isolation, IP addressing, and firewall rules
  • Optional ECM-XT add-ons: additional RAM, disk space, and client software requirements for Import Scheduler and PDF Template Plug-In

Main Findings and Discussion


The checklist defines:
  • Server systems running Windows Server 2016/2019 with SQL Server (2014–2019), PostgreSQL, or Oracle databases
  • Client machines using Windows 10/Server editions with active scripting enabled for ECM XT web components
  • Scalable hardware profiles from small (1–2 instruments) to large (31–100 instruments) deployments, including RAID configurations
  • Network specifications demanding 1 GB Ethernet, standard TCP/IP protocols, domain compliance, and optional firewall port openings
  • ECM-XT add-on requirements: minimum 8 GB RAM, 500 MB installation space, and 250 GB cache storage for Import Scheduler

Benefits and Practical Applications


  • Minimizes installation delays by clarifying preparatory tasks and resource needs
  • Ensures compatibility with existing IT policies and corporate infrastructure
  • Enables scalable deployments and future system expansions
  • Supports effective training and hand-over by coordinating user presence during installation

Future Trends and Applications


Emerging practices include virtualization and cloud-native deployments of OpenLab servers, automated provisioning workflows, AI-driven system monitoring, and predictive maintenance to maximize uptime and data integrity.

Conclusion


Adherence to a structured site preparation checklist is critical for successful implementation of Agilent OpenLab ECM XT and OpenLab Server. Following these guidelines ensures robust, scalable, and maintainable laboratory informatics environments.

References


None

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Agilent OpenLab ECM XT Server / OpenLab Server v2.3 - Site Preparation Checklist
Agilent OpenLab ECM XT Server / OpenLab Server v2.3 Site Preparation Checklist Thank you for purchasing Agilent! To get you started and to assure a successful and timely installation of your Agilent software, please refer to this specification or set…
Key words
ecm, ecmopenlab, openlabserver, serverapprover, approveredition, editionagilent, agilententerprise, enterpriseadd, addclient, clientsoftware, softwarerevision, revisiontechnologies, technologiespdf, pdfrequirements, requirementsscripting
Agilent OpenLab Shared Services Server v2.5 - Site Preparation Checklist
Agilent OpenLab Shared Services Server v2.5 Site Preparation Checklist Thank you for purchasing Agilent software. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is…
Key words
server, serveropenlab, openlabsite, sitechecklist, checklistsoftware, softwareshared, sharedpage, pageecm, ecmservices, servicescustomer, customerpreparation, preparationhardware, hardwarerequirements, requirementsspecial, specialnotes
Agilent OpenLab Shared Services Server v2.4 - Site Preparation Checklist
Agilent OpenLab Shared Services Server v2.4 Site Preparation Checklist Thank you for purchasing Agilent! To get you started and to assure a successful and timely installation of your Agilent software, please refer to this specification or set of requirements. Correct…
Key words
technologies, technologiesagilent, agilentchecklist, checklistcustomer, customeryour, yourpreparation, preparationspecial, specialnotes, notesspecifications, specificationssoftware, softwareservice, servicedisk, disksignature, signatureinstallation, installationserver
Agilent OpenLab ECM Revision 3.6 - Site Preparation Checklist
Agilent OpenLab ECM Revision 3.6 Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation of your Agilent software, please refer to this specification or set of requirements.…
Key words
ecm, ecmserver, serverdatabase, databasesql, sqlservers, serversrecommended, recommendednetwork, networkchecklist, checklistspecification, specificationoracle, oraclesite, sitedomain, domaincores, coresaccount, accountmemory
Other projects
LCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike