GCMS
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike

Gas Management Supplies for GC Labs

Brochures and specifications | 2019 | RestekInstrumentation
GC, Consumables
Industries
Manufacturer
Restek

Summary

Significance of the Topic


A clean, stable gas stream is critical for gas chromatography, ensuring reproducible results, stable detector baselines, and prolonged column life. Contaminants such as oxygen, moisture, and hydrocarbons degrade performance, accelerate stationary phase bleed, and introduce ghost peaks, making robust gas management essential for quality control, research, and industrial analysis.

Objectives and Overview


This white paper presents the design principles and components for an effective GC gas management system. It compares configurations using on-demand generators versus high-pressure cylinders, reviews regulators, tubing, fittings, traps, and diagnostics, and provides best practices to achieve ultra-high gas purity, system reliability, and operational efficiency.

Methodology and System Design


Building a leak-free gas delivery train involves:
  • Selecting gas sources: PEM hydrogen, zero air, and nitrogen generators or high-pressure cylinders.
  • Dual-stage pressure regulation for stable delivery, complemented by inline regulators at the instrument inlet.
  • Using precleaned stainless steel or copper tubing with metal-to-metal fittings to prevent outgassing and leaks.
  • Installing a tiered purification sequence (moisture → hydrocarbon → oxygen traps for carrier gas; moisture/hydrocarbon traps for fuel gas).
  • Verifying integrity and flow: electronic leak detector for trace leaks; volumetric flowmeter for precise gas flow calibration.

Used Instrumentation


  • Gas Generators: PEM H₂ generators (100–1,300 mL/min, up to 175 psig), zero air generators (<0.1 ppm hydrocarbons, 1–30 L/min), nitrogen generators (1–75 L/min, up to 99.9999%), and combined FID gas stations.
  • Pressure Regulators: UHP dual-stage and single-stage regulators in brass or stainless steel with CGA/DIN/BS fittings, plus inline regulators for point-of-use control.
  • Tubing & Fittings: Precleaned 304 SS and copper tubing (1/16″–1/4″ OD), Swagelok compression fittings, shutoff valves, manifolds, and switchover systems.
  • Diagnostics: Ex-rated electronic leak detector (He, H₂, Ar, N₂, CO₂) and ProFLOW 6000 flowmeter (0.5–500 mL/min, ±2% accuracy).
  • Gas Purifiers: Glass/polycarbonate trap cartridges and baseplates for moisture, hydrocarbon, and oxygen removal; click-on inline filters for rapid servicing.

Main Findings and Discussion


On-demand gas generators eliminate cylinder change-over downtime, provide consistent purity, and improve lab safety. Dual-stage regulators maintain constant outlet pressure despite source depletion, while inline regulators fine-tune at the GC inlet. A tiered trap system protects columns by scrubbing moisture, organics, and oxygen. Precleaned plumbing and metal fittings minimize contamination and leaks. Electronic leak detection and flow metering streamline system commissioning and routine checks.

Benefits and Practical Applications


  • Stable, contaminant-free gas streams enhance reproducibility and sensitivity.
  • Extended column and detector life reduce replacement and maintenance costs.
  • Improved laboratory safety by reducing high-pressure storage and hazardous leaks.
  • Operational efficiency via on-demand gas supply, automated switchover, and reduced downtime.
  • Scalable designs support multiple GC instruments and diverse detector requirements.

Future Trends and Opportunities


The future of GC gas management lies in digital integration—smart sensors, remote monitoring, and predictive maintenance will optimize purity and uptime. Portable, benchtop generators and miniaturized purifiers will enable field-deployable GC. Sustainable purification media and modular cartridges will support green-lab initiatives. Seamless LIMS integration will unify gas management with overall laboratory workflows.

Conclusion


Implementing a modular gas management system with on-demand generators, precision regulators, precleaned plumbing, effective traps, and electronic diagnostics delivers the ultra-pure, stable gas required for high-performance GC. Adopting these strategies enhances safety, lowers operational costs, and ensures consistent analytical quality.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Maximize Performance! - Gas Chromatography Accessories and Gas Purification/Management Products
Maximize Performance! Gas Chromatography Accessories and Gas Purification/Management Products Septa Liners Ferrules Solvents Syringes Vials Purifiers and more Maximize Performance! Choosing the Correct Products Choosing the proper items for routine system maintenance and new column installation can save costly downtime…
Key words
cone, conestage, stageneedle, needledescription, descriptionpurifier, purifierbevel, bevelline, linesyringes, syringespurifiers, purifiersmanufacturer, manufacturersupelco, supelcogauge, gaugegas, gasremovable, removableuhp
Maximize Performance! - Gas Chromatography Accessories and Gas Purification/ Management Products
Maximize Performance! Gas Chromatography Accessories and Gas Purification/ Management Products The life science business of Merck operates as MilliporeSigma in the U.S. and Canada. Maximize Performance! Gas Chromatography Accessories and Gas Purification/ Management Products 2 Table of Contents Choosing the…
Key words
cone, conedescription, descriptionstage, stageneedle, needlepurifier, purifierbevel, bevelmanufacturer, manufacturerline, linesuprasolv, suprasolvsyringes, syringespurifiers, purifierssupelco, supelcogas, gasvials, vialsremovable
Gas Management Systems for GC
Gas Management Systems for GC
2000|Merck|Technical notes
Supelco Park Bellefonte, PA 16823-0048 USA Telephone 800-247-6628 • 814-359-3441 Fax 800-447-3044 • 814-359-3044 email: supelco@s ial.com http://www.sigma-aldrich.com Bulletin 898C Gas Management Systems for GC The information in this bulletin, in combination with the instruction manual for your chromatograph, will…
Key words
shutoff, shutoffpressure, pressureregulator, regulatorvalve, valvecylinder, cylinderline, linestage, stagerelief, relieffilter, filtergas, gasgauge, gaugesupelco, supelcotubing, tubingair, airhydrogen
Gas Management Systems for GC
Gas Management Systems for GC
2000|Merck|Technical notes
Supelco Park Bellefonte, PA 16823-0048 USA Telephone 800-247-6628 • 814-359-3441 Fax 800-447-3044 • 814-359-3044 email: supelco@s ial.com http://www.sigma-aldrich.com Bulletin 898C Gas Management Systems for GC The information in this bulletin, in combination with the instruction manual for your chromatograph, will…
Key words
shutoff, shutoffpressure, pressureregulator, regulatorvalve, valvecylinder, cylinderline, linestage, stagerelief, relieffilter, filtergas, gasgauge, gaugesupelco, supelcotubing, tubingair, airhydrogen
Other projects
LCMS
ICPMS
Follow us
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike