Agilent 8700 LDIR Chemical Imaging System - Site Preparation Checklist

Manuals | 2019 | Agilent TechnologiesInstrumentation
FTIR Spectroscopy
Industries
Manufacturer
Agilent Technologies

Summary

Significance of the Topic


The successful installation and long‐term reliability of advanced analytical instruments, such as chemical imaging systems, depend heavily on thorough site preparation. Proper planning of laboratory space, environmental controls, power infrastructure, and consumable supplies helps avoid delays, reduces operational risks, and ensures consistent performance over the instrument’s lifetime.

Objectives and Study Overview


This guide outlines the essential requirements and steps to prepare a laboratory for the installation of the Agilent 8700 LDIR Chemical Imaging System. It presents a consolidated checklist covering workspace dimensions, environmental conditions, electrical and gas utilities, hardware specifications, and required operating supplies.

Methodology and Instrumentation


The site preparation methodology follows a systematic review of customer responsibilities and infrastructure readiness:
  • Bench space and weight capacity assessment, ensuring adequate clearance for air circulation and connections.
  • Environmental evaluation, including ambient temperature stability (20–30 °C), humidity control (50–80 %), and clean-air conditions.
  • Electrical infrastructure validation: a dedicated 100–240 VAC, 50–60 Hz circuit with proper grounding, capable of delivering up to 236 VA.
  • Supply of clean, water-free compressed air or dry nitrogen meeting ISO 8573-1:2010 Class 2.2.1 at ~138 kPa, with recommended continuous purge flow of 10 L/min.
  • Verification of computer workstation specifications, including Intel Core i7-7700K or better, 32 GB RAM, 512 GB PCIe SSD, 2 GB video memory, and 4K display capability.

Used Instrumentation


  • Agilent 8700 LDIR Chemical Imaging System (including sample planer and PC setup options).
  • HP Z4 G4 Workstation (Intel Core i7-7700K, 32 GB DDR4 RAM, 512 GB PCIe SSD, 2 GB video memory, Windows 10 Pro 64).

Key Results and Discussion


Analysis of the installation requirements revealed:
  • Total instrument weight of ~45 kg (100 lbs) and shipping weight of ~72 kg, requiring a stable bench free of overhead obstructions.
  • Minimum clearance of 10 cm on each side and 15 cm at the rear to maintain airflow and access to connectors.
  • Strict ambient temperature control with fluctuations ≤1 °C per hour to prevent instrument drift.
  • Electrical grounding and dedicated outlets are critical to safety and noise reduction.
  • Continuous purge gas supply prevents contamination and preserves optical components.

Benefits and Practical Applications


By adhering to the site preparation checklist, laboratories can:
  • Minimize installation delays and potential rescheduling.
  • Ensure optimal instrument performance and data quality from day one.
  • Reduce maintenance costs and extend the operational lifetime.
  • Safeguard user safety and comply with regulatory requirements.

Future Trends and Possibilities


Emerging developments in laboratory automation and smart environment monitoring may streamline site preparation processes. Integration of digital twins, real-time environmental sensors, and predictive maintenance algorithms can further reduce setup time and enhance instrument uptime. Advances in instrument design may also relax some site constraints, enabling more flexible deployment in diverse research and industrial settings.

Conclusion


Comprehensive site preparation is a foundational step for the successful deployment of the Agilent 8700 LDIR Chemical Imaging System. Careful attention to space allocation, environmental stability, power delivery, and gas supply ensures reliable operation, high data integrity, and cost-effective maintenance throughout the instrument’s service life.

Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.

Downloadable PDF for viewing
 

Similar PDF

Toggle
Agilent Vaya Raman (G6915A) Site Preparation Checklist
Agilent Vaya Raman (G6915A) Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the…
Key words
checklist, checklistsite, sitepage, pagevaya, vayacustomer, customerspecial, specialpreparation, preparationpower, powercord, cordoperating, operatingnotes, notesraman, ramandescription, descriptionyour, yourinstrument
Agilent Cary 630 FTIR Site Preparation Checklist
Agilent Cary 630 FTIR Site Preparation Checklist
2023|Agilent Technologies|Manuals
Agilent CrossLab Start Up Services Agilent Cary 630 FTIR Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start Up is focused on helping customers shorten the time it takes to start realizing the full value…
Key words
condensing, condensingpolystyrene, polystyrenepower, powerservice, servicespecial, specialcord, cordinstrument, instrumentkbr, kbrcustomer, customersite, sitehumidity, humidityqualification, qualificationpurge, purgefilm, filmnon
8890 GC SP1-0042 Natural Gas Analyser Site Preparation Checklist
Agilent CrossLab Start-Up Services 8890 GC SP1-0042 Natural Gas Analyser Site Preparation Checklist Thank you for purchasing an instrument from Agilent Technologies. CrossLab Start-Up is focused on helping customers shorten the time it takes to start realizing the full value…
Key words
termination, terminationoven, ovensite, sitedissipation, dissipationrequirements, requirementscountry, countryamps, ampspower, powercustomer, customerspecial, specialheat, heatplug, pluggas, gasuntied, untiedinstrument
Agilent 5977 Series MSD - Site Preparation Checklist
Agilent 5977 Series MSD Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the…
Key words
checklist, checklistagilent, agilentsite, sitegas, gasreagent, reagentturbo, turbocord, cordoptional, optionalpreparation, preparationpower, powersupplies, suppliessfc, sfccarrier, carrierhydrogen, hydrogengrade
Other projects
LCMS
ICPMS
Follow us
FacebookX (Twitter)LinkedInYouTube
More information
WebinarsAbout usContact usTerms of use
LabRulez s.r.o. All rights reserved. Content available under a CC BY-SA 4.0 Attribution-ShareAlike