Site Requirements - Biotage Extrahera LV-200
Brochures and specifications | 2021 | BiotageInstrumentation
The successful deployment of automated solid-phase extraction systems in analytical laboratories depends on rigorous site preparation. Proper installation avoids safety hazards, ensures compliance with operational specifications and maximizes the instrument’s uptime and analytical reliability.
This document outlines the essential laboratory requirements for installing the Biotage Extrahera LV-200. It aims to guide facility managers and end users through space planning, environmental controls, utility connections and verification steps needed for a seamless setup.
This summary is based on the official site requirements manual for the Biotage Extrahera LV-200. The core instrument under discussion is the Biotage Extrahera LV-200 automated extraction platform. Site qualification follows a checklist approach covering ventilation, load-bearing, utilities and safety systems.
The key installation parameters are:
The manual also specifies that two pressure regulators and adapters are provided. A system checkout using a high-precision balance and deionized water verifies proper installation.
Adhering to these site requirements ensures:
Advances in lab automation will drive integration of SPE platforms with LC-MS and other online systems. Future developments may focus on compact, self-ventilated designs, modular gas management and enhanced remote monitoring for quality assurance.
Meeting the ventilation, structural, environmental and utility specifications is vital for a reliable installation of the Biotage Extrahera LV-200. Careful site preparation accelerates commissioning, ensures user safety and supports high-quality analytical workflows.
Sample Preparation
IndustriesManufacturerBiotage
Summary
Importance of the topic
The successful deployment of automated solid-phase extraction systems in analytical laboratories depends on rigorous site preparation. Proper installation avoids safety hazards, ensures compliance with operational specifications and maximizes the instrument’s uptime and analytical reliability.
Objectives and Study Overview
This document outlines the essential laboratory requirements for installing the Biotage Extrahera LV-200. It aims to guide facility managers and end users through space planning, environmental controls, utility connections and verification steps needed for a seamless setup.
Methodology and Instrumentation
This summary is based on the official site requirements manual for the Biotage Extrahera LV-200. The core instrument under discussion is the Biotage Extrahera LV-200 automated extraction platform. Site qualification follows a checklist approach covering ventilation, load-bearing, utilities and safety systems.
Used Instrumentation
- Biotage Extrahera LV-200 automated solid-phase extraction system
Main Results and Discussion
The key installation parameters are:
- Ventilation: Dedicated fume hood or equivalent exhaust achieving ≥6 m³/min; optional duct adapter (159 mm OD, 152.7 mm ID) for benchtop installations.
- Weight and Footprint: Package weight 125 kg; unpacked instrument 80 kg; bench or hood must support this load. Dimensions with touchscreen 860×570×790 mm; without touchscreen 610×510×790 mm.
- Environmental Conditions: Ambient temperature 18–32 °C, humidity 10–90 % RH, low dust and particle emission.
- Electrical Supply: 100–240 VAC, 50/60 Hz, 300 VA, properly grounded outlet.
- Gas Supply: Filtered air and nitrogen per ISO 8573-1 class 1-x-1. Air: 5 L/min at 6 bar; N₂: 1 L/min processing, 70 L/min drying at 6 bar; tubing 6 mm OD, 4 mm ID.
- Vacuum Supply: <500 mbar, ≥8.3 L/min, tubing 6 mm OD, 4 mm ID.
- Fire Protection: External safeguards per local regulations for unattended equipment.
The manual also specifies that two pressure regulators and adapters are provided. A system checkout using a high-precision balance and deionized water verifies proper installation.
Benefits and Practical Applications of the Method
Adhering to these site requirements ensures:
- Safe operation without gas or particle exposure risks.
- Optimal extraction performance and reproducibility.
- Reduced downtime and maintenance by preventing contamination.
Future Trends and Potential Applications
Advances in lab automation will drive integration of SPE platforms with LC-MS and other online systems. Future developments may focus on compact, self-ventilated designs, modular gas management and enhanced remote monitoring for quality assurance.
Conclusion
Meeting the ventilation, structural, environmental and utility specifications is vital for a reliable installation of the Biotage Extrahera LV-200. Careful site preparation accelerates commissioning, ensures user safety and supports high-quality analytical workflows.
Reference
- Biotage. Site Requirements: Extrahera LV-200. Literature Number UI472, 2021.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
Biotage® Extrahera (Site Requirements)
2019|Biotage|Manuals
User Instruction UI326.v5 Site Requirements Biotage Extrahera | Page 1 ® ™ Site Requirements Biotage Extrahera ® ™ Dear Valued Customer, The following document will assist you in the preparation of your laboratory for a successful installation of Biotage Extrahera…
Key words
supply, supplyfume, fumehood, hoodresponsibility, responsibilityventilation, ventilationrequirements, requirementsbiotage, biotagepressure, pressureiindia, iindiasystem, systemensure, ensurecustomer, customergas, gasspecified, specifieddimensions
Biotage Extrahera LV-200 - Installation and Safety
2021|Biotage|Manuals
Biotage Extrahera LV-200 ® Installation and Safety ™ Contents Biotage Extrahera LV-200 ® ™ Installation and Safety CONTENTS 1 Installation 1 Download Biotage Extrahera User Documentation 1 Software License Agreement 1 Delivered Items 1 Site Requirements 2 Move the System 5 Upgrade the Biotage Extrahera Software…
Key words
biotage, biotagesafety, safetysystem, systemventilation, ventilationfume, fumehood, hoodconnect, connectextrahera, extraheramust, mustwaste, wastepoor, poorinstallation, installationdirective, directiveconnected, connectedexcellent
Biotage Extrahera (Installation and Safety)
2020|Biotage|Manuals
Biotage Extrahera ® Installation and Safety ™ Contents Biotage Extrahera ® ™ Installation and Safety CONTENTS 1 Installation 1 Download Biotage Extrahera User Documentation 1 Software License Agreement 1 Delivered Items 1 Site Requirements 2 Move the System 5 Connections 5 Upgrade the Biotage Extrahera Software ®…
Key words
biotage, biotagesafety, safetyextrahera, extraherasystem, systemmust, mustpoor, poorventilation, ventilationfume, fumehood, hoodinstallation, installationair, airduct, ductconnect, connectexcellent, excellentdirective
Biotage Extrahera LV-200 Installation and Familiarization Checklist
2021|Biotage|Manuals
Biotage Extrahera LV-200 Installation and Familiarization Checklist | Page 1 ® ™ Biotage Extrahera LV-200 Installation and Familiarization Checklist ® ™ The following document will ensure that the installation is complete and that all installation steps and tasks have been…
Key words
fail, failpass, passtasks, tasksnotes, notesversion, versionchecklist, checklistreview, reviewinstallation, installationfamiliarization, familiarizationsystem, systemcustomer, customervac, vacdate, datemains, mainsventilation