OpenLAB ECM Intelligent Reporter Server, revision A.02.05 - Site Preparation Specification Issued:
Manuals | 2016 | Agilent TechnologiesInstrumentation
Proper site preparation is essential to ensure reliable and long-term operation of OpenLAB ECM Intelligent Reporter in analytical laboratories. By verifying that hardware, software, and network environments meet or exceed requirements, organizations can avoid installation delays, performance issues, and unplanned downtime.
This Site Preparation Specification aims to guide laboratory managers, IT teams, and Agilent engineers through evaluating and preparing the installation site for both the ECM Intelligent Reporter Server and Client. The primary objectives are:
The methodology consists of a structured checklist and preparatory tasks including:
The specification confirms that Intelligent Reporter integrates with existing ECM 3.4 and 3.5 infrastructures with minimal additional requirements. Key points include:
Implementing this site preparation checklist offers several advantages:
Emerging directions may include:
This Site Preparation Specification establishes a comprehensive foundation for successful deployment of OpenLAB ECM Intelligent Reporter by detailing all necessary hardware, software, and network prerequisites. Adhering to these guidelines promotes reliable operation, simplifies installation, and extends system longevity.
No additional literature references were provided in the source document.
Software
IndustriesManufacturerAgilent Technologies
Summary
Significance of the topic
Proper site preparation is essential to ensure reliable and long-term operation of OpenLAB ECM Intelligent Reporter in analytical laboratories. By verifying that hardware, software, and network environments meet or exceed requirements, organizations can avoid installation delays, performance issues, and unplanned downtime.
Objectives and overview of the specification
This Site Preparation Specification aims to guide laboratory managers, IT teams, and Agilent engineers through evaluating and preparing the installation site for both the ECM Intelligent Reporter Server and Client. The primary objectives are:
- Confirm compatibility of client and server hardware.
- Ensure required operating systems, frameworks, and add-ins are installed.
- Provide a clear checklist of customer responsibilities prior to installation.
Methodology and instrumentation
The methodology consists of a structured checklist and preparatory tasks including:
- Assessment of client hardware matching OpenLAB CDS requirements.
- Verification of supported Windows operating systems (Windows 7 SP1, Windows 8.1, Windows Server 2008 R2 SP1, Windows Server 2012 R2).
- Installation of .NET Framework 3.5 SP1 or higher and appropriate Adobe Reader versions.
- Specification of Reporter Server hardware: 2 GHz processor, minimum 1 GB RAM (4 GB recommended), 2 GB free disk space, DVD-ROM drive.
- Database server requirements in line with standard ECM infrastructure; optional RAID 1 for large spectral data storage.
- Network configuration to allow HTTP traffic on port 80 and SQL Server connectivity on ports 1433 and 1434.
- Installation of ECM hotfixes and Shared Services Control Panel components.
Main findings and discussion
The specification confirms that Intelligent Reporter integrates with existing ECM 3.4 and 3.5 infrastructures with minimal additional requirements. Key points include:
- Client machines require a modern Windows OS, .NET 3.5 SP1, and Adobe Reader 9 or 11 depending on ECM version.
- Reporter Server must run Windows Server OS with Microsoft SQL Server Reporting Services (2008 R2, 2012, or 2014 Standard/Enterprise).
- Database servers follow standard ECM guidelines; storing diode array or multi-dimensional spectral data demands attention to storage capacity and disk performance.
- Firewall rules must allow incoming HTTP requests and database connections for seamless report generation.
Benefits and practical applications of the method
Implementing this site preparation checklist offers several advantages:
- Smoother, faster installations with fewer on-site complications.
- Clear division of responsibilities between customers and Agilent, improving planning.
- Assurance of regulatory compliance by meeting defined IT and software standards.
- Prevention of performance bottlenecks through upfront hardware and network validation.
Future trends and potential applications
Emerging directions may include:
- Deployment of ECM and Reporter in virtualized or cloud environments for enhanced scalability.
- Automation of site checks through infrastructure-as-code and remote monitoring tools.
- Integration with laboratory information management systems and AI-driven analytics to enrich reporting capabilities.
Conclusion
This Site Preparation Specification establishes a comprehensive foundation for successful deployment of OpenLAB ECM Intelligent Reporter by detailing all necessary hardware, software, and network prerequisites. Adhering to these guidelines promotes reliable operation, simplifies installation, and extends system longevity.
References
No additional literature references were provided in the source document.
Content was automatically generated from an orignal PDF document using AI and may contain inaccuracies.
Similar PDF
OpenLAB ECM: Site Preparation Checklist - ECM 3.4.1 and 3.4.1 SP1
2014|Agilent Technologies|Manuals
OpenLAB ECM 3.4.1 and 3.4.1 SP1 – Site Preparation Checklist OpenLAB ECM: Site Preparation Checklist ECM 3.4.1 and 3.4.1 SP1 o Including ECM Scheduler and Client plug-ins Issued: 09-May-2014 Revision: 3.4.1.2 Copyright 2014 1 Page 1 of 10…
Key words
copyright, copyrightchecklist, checklistsite, siteecm, ecmdvd, dvdrom, romtechnologies, technologiesmemory, memoryprocessor, processorverify, verifyacrobat, acrobatadobe, adobeclient, clientagilent, agilentdisks
Agilent OpenLAB ECM 3.5 - Site Preparation Checklist
2015|Agilent Technologies|Manuals
OpenLAB ECM 35 – Site Preparation Checklist OpenLAB ECM: Site Preparation Checklist ECM 3.5 o Including ECM Scheduler and Client plug-ins Issued: 30-Nov-2015 Revision: 3.5 Copyright 1 2015 Page 1 of 9 Agilent Technologies OpenLAB ECM 35 –…
Key words
copyright, copyrightchecklist, checklistsite, sitedvd, dvdrom, rommemory, memoryprocessor, processorecm, ecmverify, verifytechnologies, technologiesdisks, disksspecification, specificationagilent, agilentpreparation, preparationoracle
Agilent OpenLAB ECM: Site Preparation Checklist
2015|Agilent Technologies|Manuals
OpenLAB ECM 35 – Site Preparation Checklist OpenLAB ECM: Site Preparation Checklist ECM 3.5 o Including ECM Scheduler and Client plug-ins Issued: 30-Nov-2015 Revision: 3.5 Copyright 1 2015 Page 1 of 9 Agilent Technologies OpenLAB ECM 35 –…
Key words
copyright, copyrightchecklist, checklistsite, sitedvd, dvdrom, romprocessor, processormemory, memoryecm, ecmverify, verifytechnologies, technologiesdisks, disksspecification, specificationpreparation, preparationagilent, agilentoracle
Agilent OpenLab ECM Revision 3.6 - Site Preparation Checklist
2019|Agilent Technologies|Manuals
Agilent OpenLab ECM Revision 3.6 Site Preparation Checklist Thank you for purchasing an Agilent system. To get you started and to assure a successful and timely installation of your Agilent software, please refer to this specification or set of requirements.…
Key words
ecm, ecmdatabase, databaseserver, serversql, sqlservers, serversrecommended, recommendednetwork, networkchecklist, checklistspecification, specificationoracle, oraclesite, sitedomain, domaincores, coresaccount, accountprocessor